NNRK Solutions

Valence

Coming soon

Cloud ERPby NNRK Solutions

Nothing is edited after the fact.

Finance, manufacturing and people on a ledger that only appends. A correction is a reversal, and every figure drills back to its voucher.

12 W LED bulb, B22 cap: cost of one unit

VL/PRD/PO-1184

Production order · 400 units

Bill of materials, per unitPKR
LED board assembly3 components148.50
  • LED chip, 283524 pcs at PKR 4.50108.00
  • Aluminium MCPCB1 pcs at PKR 32.5032.50
  • Solder paste1 g at PKR 8.008.00
Driver assembly4 components120.00
  • Driver PCB1 pcs at PKR 18.0018.00
  • Electrolytic capacitor2 pcs at PKR 11.5023.00
  • Constant-current IC1 pcs at PKR 46.0046.00
  • Passives kit1 set at PKR 33.0033.00
Housing set3 components80.00
  • Aluminium heat sink1 pcs at PKR 42.0042.00
  • Polycarbonate diffuser1 pcs at PKR 21.0021.00
  • B22 base cap1 pcs at PKR 17.0017.00
Material348.50
  1. Direct labour0.80 h at PKR 87.50Standard rate, assembly line70.00
  2. Manufacturing overhead0.80 h at PKR 50.00Absorbed on labour hours40.00
Standard cost, one unit458.50
Actual, this order466.00Variance · over standard7.50

Modules

What is in it

Everything here is coming soon unless a row says otherwise.

The ledger and control

One accounting pipeline that every other module posts through.

  • Immutable double-entry: entries are reversed, never edited
  • Drill-down from a statement line to account, dimension, voucher and approval
  • Maker-checker approval chains, dimension-level permissions and a full audit trail
  • Each company's ledger data isolated in its own database schema
Finance

The books, the bank and the group.

  • General ledger, payables, receivables and banking with reconciliation
  • Fixed assets on two books, treasury and a 13-week cash forecast
  • Group consolidation, currency translation and eliminations
  • IFRS and Companies Act 2017 financial statements
Pakistan tax and SECP

Modelled as rules with dates on them, not as rates in the code.

  • Sales tax returns, withholding and income tax prepared from the entries
  • SECP registers, board minutes and statutory forms
  • A change in the law is configuration rather than a release
  • Figures are computed and prepared; filing stays with you and your adviser
Supply chain

What comes in, what goes out, and what it was worth.

  • Inventory with batch trace and stock counts
  • Procurement with three-way match and landed cost
  • Sales, dispatch, dealers and commissions
  • Imports and exports, and a POS till
Manufacturing and costing

From the bill of materials to what a unit actually cost.

  • BOM, routing and engineering changes
  • MRP, capacity and finite scheduling
  • Work orders, shop-floor confirmations, Kanban, quality and maintenance
  • Standard and job costing, with variance back to material, labour and overhead
HR and attendance

The employee record, and who was where.

  • Employee records, org chart, positions and grades
  • Joining, transfers, cases and exits
  • Shifts, rosters and GPS geo-fenced check-in by site
  • Leave types, balances and a monthly attendance close
Payroll and benefits

Pay runs that post straight into the ledger.

  • Pay runs, payslips, salary structures and off-cycle runs
  • Income tax, EOBI, PESSI, provident fund and loans
  • Bonuses, benefits and total employer cost
Performance, learning and recruitment

The rest of the people side.

  • Goals, OKRs, 360 feedback and appraisals
  • Training, development plans and succession
  • Vacancies, a public careers portal, interviews and offers
  • Self-service for every employee
CRM and service

The customer before the order and after the delivery.

  • Customer 360, leads, campaigns and cases
  • Service contracts, field visits and SLAs
Reports, planning and configuration

What a customer can build and change for themselves.

  • Drag-and-drop Report Studio, and Power BI feeds
  • Budgets, and a ten-year forecast with scenarios
  • Own fields, voucher types, approval chains and formulas, without a deployment
  • A Migration Center for bringing history in from a legacy system
Embedded AI

It drafts and it checks. It does not post.

  • Answers questions about your data, with the source cited
  • Drafts entries for a person to review
  • Audits the books independently of whoever keeps them
  • Every suggestion requires human approval before it posts

How it fits together

From the day's work to the trial balance

An accountant's first question about any system is which number is entered and which is derived. Every figure Valence reports traces back to an entry, and every entry traces back to something somebody actually did. Valence is coming soon, and this is the shape it is being built to.

Operations

Whoever takes the payment or issues the voucher is working in their own screen, not in an accounting one. Nobody here is doing bookkeeping.

Procurement

Orders, receipts, issues

Production

BOM, routing, shop floor, WIP

Sales

Orders, dispatch, invoicing

HR and payroll

Attendance, pay runs, deductions

Posting rules

Nothing is queued for an overnight run, and nothing is summarised into a total that cannot be taken apart again.

Every event posts a balanced entry

Debits and credits, at the moment it happens

General ledger

Every figure below is read from these entries. There is no second set kept alongside for reporting, and no month-end rebuild to wait for.

This company's own ledger

Isolated per tenant, append only

Reporting

A figure in a report is a sum of entries, and the entries are still there to open.

Trial balance

Drills to the voucher

P&L and balance sheet

By company or dimension

Product costing

Standard against actual

Tax registers

Computed and prepared

Everything in Valence takes this path. There is no side route that skips the middle.

Behind one transaction

What the books do while you work

Nobody using Valence types this. It is what the software posts on its own when the event above happens, and it is why the month-end figures are already there.

Production order PO-1184 drawn and closed

VL/PRD/PO-1184

AccountDebitCreditPKR
  1. Dr186,400.00
  2. Cr142,000.00
  3. Cr28,800.00
  4. Cr15,600.00
  5. Dr183,400.00
  6. Dr3,000.00
  7. Cr186,400.00
Total · PKR372,800.00372,800.00

Balanced

Material leaves stock at WAC, labour and overhead are applied, and the variance shows on close instead of at year end.

The numbers you get

What you can pull out of it

  • Trial balance with drill-down

    Which voucher and which approval produced this line

  • Standard versus actual cost

    What a unit was meant to cost, and what it did

  • Variance decomposition

    How much of the gap was material, labour and overhead

  • Stock and WIP valuation

    What is sitting on the floor, at what value

  • Payroll register

    What each person was paid, and the tax, EOBI and PESSI behind it

Next step

See it on your own numbers

A demo runs on your chart of accounts, not a sample company. Tell us what you run and we will set it up before we meet.

Valence

by NNRK Solutions

Book a consultationWhatsApp